Self Installation Instructions

Begin hanging draperies at the Master Slide (Figure A). Place hooks in each successive carrier.

To train drapery headings: (Figure B) On conventional traverse rods, place your finger behind the flat fabric space between the pleats. Gently tug the heading forward and away from the rod. Repeat across the entire panel.

PLEASE NOTE: Drapery panels from Aloha Drapery are custom manufactured and professional installation is recommended.

Join our mailing list and receive 10% off your first order


Manufactured Locally in Hawaii by

Made in Hawaii with Aloha

Made in Hawaii

Certified products protect the integrity and value of authentic Hawaii branded items and is certified by the Hawaii Department of Agriculture, the Hawaii Department of Business, Economic Development and Tourism, and the Chamber of Commerce of Hawaii.
Aloha Drapery
© Copyright2024 AlohaDrapery.com. All Rights Reserved.
RaneWorks, LLC